Replacement of the tug's fender in February 2020. Including assembly and drilling of fender, transport, fabrication and replacement of fender brackets and supports and installation on vessel.
Fabrication For Oil and Gas Industry
Fabrication For Power Water Katherine and fabricated for their overhead crane supplier ACE Material Handling
Fabrication For Bhagwan Marine
For Kotug Australia
For GEMCO
For Qube Energy
Rio Tinto Alcan
Fabrication, machining and surface treatment for GEMCO
Carpentaria Shipping
© 2019 SLE Engineering Pty Ltd
Engineering Web Design by Dash.